Tuesday, May 5, 2020
History Of Ibs In Malaysia Construction Essay Example For Students
History Of Ibs In Malaysia Construction Essay This chapter explains about the procedure of installing steel bordering constituent and to place the safety facet and the demand during the installing procedure of steel bordering constituent at site and to place the degree of safety during installing procedure at site. For this chapter, definition and description of Industrialised Building System will be given. Beside that this chapter besides included history of IBS in Malaysia, installing procedure, safety demand during the installing work and more. 2.1.1 Industrialised Building System ( IBS ) Industrialised Building System is a engineering of building which there are manufactured in controlled environment, either at off site or site. And so merely transported, positioned and assembled into the building works ( CIDB, 2012 ) . There are five chief IBS groups identified in Malaysia, there are: Abdullah and Egbu, 2009 IBS is the method of building developed due to human investing in invention and on rethinking the best manner of building work bringings based on the degree of industrialization. Hassim et. Al, 2009 IBS is defined as an organizational procedure continuity of production, connoting a steady flow of standardization, demand, integrating of the different phases of the whole production procedure, a high grade of administration of work, and mechanization to replace human labor wherever possible. Chung, 2007 IBS is defined as a mass production of edifice constituents, either at site or in the mill, harmonizing to the specification with a standard form and dimensions and so transporting them to the building site to be re-arranged to a certain criterion to organize a edifice. Badir et.al, 2002 IBS is defined as a construct of mass production of quality edifice by utilizing new constructing systems and mill produced edifice constituent. Haron et.al, 2005 IBS besides defined as a new building method that can increase the quality and productiveness of work through the usage of better equipment, stuffs, works and machinery and extended undertaking planning. Zulkefle, 2007 Defined IBS as a set of interconnected elements that act together to enable the designated public presentation of a edifice. Therefore, from the information I get they say that Industrialised Building System ( IBS ) is a procedure of the steel frame constituent are manufactured in the mill with standard demand and so transported to the occupation site for installing to be assemble together to organize a edifice. Other than that, it is interesting to observe that the term Industrialised Building System ( IBS ) is frequently misunderstand as systems limited merely for building of edifice. But IBS really covers all types of constructions as the word edifice really related to building ( Shaari and Elias 2003 ) . 2.1.2 History of IBS in Malaysia IBS were introduced in Malaysia in 1960 s after the Ministry of Housing and Local Government of Malaysia visited several European states and measure their lodging development plan ( Thanoon et.al,2003 ) . After their visit in twelvemonth 1964, the first undertaking utilizing IBS had started by the authorities. To construct quality and low-cost house and rush up the bringing clip were the purpose for this undertaking. About 22.7 estates of land along the Jalan Pekeliling, Kuala Lumpur was devoted to the undertaking consisting 7 blocks of 17 narratives level, 3000 units of low-priced level and 40 stores lot. This undertaking was awarded to JV Gammon A ; Larsen and Neilsen utilizing big panel precast concrete wall and board slabs. The undertaking was completed within 27 month including the clip taken in the building of RM2.5 million projecting pace at Jalan Damansara ( CIDB, 2006 ; CIDB, 2003 and Thanoon et Al, 2003 ) . The 2nd lodging undertaking initiated by the authorities comprise of 3 block of 18 narratives flats and 6 blocks of 17 narratives flats at Jalan Fifle Range, Penang in twelvemonth 1965. Hochtief and Chee Seng was awarded by utilizing Gallic Estoit System ( CIDB,2006 ; CIDB, 203 and Din, 1984 ) . Another earliest IBS undertaking was at Taman Tun Sardon, Penang ( 1,000 units of five floors walk up falt ) . IBS precast constituent and system in the undertaking was designed by British Research Establishment for low cost lodging utilizing precast system. A similar system was constructed at Edmonton, North London. About 20,000 precast homes were constructed throughout UK from 1964 to 1974 ( CIDB, 2006 ) . However, the edifice design was really basic and non sing the facet of serviceableness ( Rahman and Omar, 2006 ) . Many building in the undermentioned old ages utilised precast wall panel system. One can detect that IBS was engage at first topographic point in the building of low cost high rise residential edifice to get the better of the increasing demand for lodging demands ( CIDB, 2006 ) . However, the industrialization of building at the earlier phase was neer sustained. Failure of early closed fabricated system made the industry participants afraid of altering building method. Some of the foreign systems that were introduced during late sixties and 70s were besides found non to be suited with Malaysia societal patterns and clime ( CIDB, 2005 ) . Newer and better engineerings were invariably being introduced in the market. Wet joint systems were identified to be more suited to be used in our tropical clime. It besides was better to utilised the bathroom types which comparatively wetter than those in Europe ( CIDB, 2005 ) . In 1978. the Penang State Government launched another 1200 units of lodging utilizing prefabrication engineering. Two twelvemonth subsequently, the Ministry of Defence Adopted big prefabricated panel building system for building 2800 units of living one-fourth at Lumut Naval Base 9 Trikha and Ali, 2004 ) . During the period of early 80s up to 90s the usage of structural steel constituents turn peculiarly in high rise edifice in Kuala Lumpur. The use of steel construction gained much attending with the building of 36 storey Dayabumi composite that was completed in 1984 by Takenaka Corporation of Japan ( CIDB, 2003 and CIDB, 2006 ) . In the 90s, demand for the new township has seen the addition in the usage of precast concrete system in high rise residential edifices. Between 1981 to 1993, Perbadanan Kemajuan Negeri Selangor ( PKNS ) as province authorities development bureau acquired precast concrete engineering from Praton Haus International. It was based on Germany to construct low cost house and high cost cottage for the new townships in Selangor ( CIDB, 2003 and Hassim et al.2009 ) . It was recorded around 52,000 lodging units was constructed utilizing Praton Haus system ( Trikha and Ali, 2004 ) . In the flourishing period of Malayan building 1994 to 1997, intercrossed IBS application used in many national iconic landmarks such as Kuala Lumpur Convention Center, Bukit Jalil Sport Complex constructed utilizing steel beam and roof trusses and precast concrete. Other than that, Lightweight Railway Train ( LRT ) and KL Sentral was constructed by utilizing steel roof construction and precast hallow nucleus. While KL Towe was built by utilizing steel beams and column for tower caput. Kula Lumpur International Airport ( KLIA ) was contructed by steel roof construction and Petronas Twin Towers was 9 steel beams and steel decking for the floor system. ( CIDB, 2006 ) The local IBS makers were mushrooming, althrough yet to run in full capacity. The current IBS systems used in Malaysia lodging undertakings are steel frame, precast frame, formwork frame and big panel system. These system is mostly used for private residential undertaking in Shah Alam, Wangsa maju, and Pandan ( Sarja, 1998 ) , Dua Residency in Kuala Lumpur, Taman Mount Austin and Tongkang Pecah in Johor ( CIDB,2006 ) . The new coevals of edifice that utilized IBS is better every bit compared to conventional method in term of velocity, cost, quality and architectural visual aspect. Steel frame, precast panel and other IBS systems were used intercrossed building technique to build authorities edifice ( CIDB, 2006 ) . 2.2 Categorization of IBS This subdivision will be explicate the categorization of IBS published in Malaysia. IBS was classified as a portion of modern of building ( MMC ) . MMC is term adopted as a corporate description for both offsite based building engineerings and advanced onsite engineerings. The latter includes techniques such as tunnel form building and thin articulation block work ( Goodier A ; Gibb, 2006 ) . MMC besides include modern methods of building of floor or roof cassettes, precast concrete foundation assemblies, preformed wiring looms, and mechanical technology complexs. They besides can include advanced techniques such as thin articulation block work or burrow signifier ( NAO, 2005 and Gibb and Pendlebury, 2006 ) . As the mention, IBS is in which constituent are manufactured, positioned and assembled into a construction with minimum extra site works both on site or off site ( CIDB, 2003 and Chung, 2006 ) . While on on site IBS can be in the signifier of unmoved precast system utilizing steel formwork and off site techniques is the description of the spectrum of which are manufactured assembled remote from constructing site prior to i nstalling in their place. Whereas all off site may be regarded as falling within a generic IBS and MMC header, non all IBS and MMC may see as off site ( Gibb and Pendleton, 2006 ) . Pre-fabrication is a fabrication procedure by and large taking topographic point at a specialized installation, in which assorted stuff are joined to organize a constituents portion of concluding installing ( Tatum et al, 1986 ) . While the constituents possibly assemble on and off site. Pre-assembly carried on a definition as a procedure by which assorted stuff, pre-fabricated constituents and or equipment are joined together at a distant location for subsequent installing as a sub unit. it by and large focused on system. Therefore, a generic categorization of IBS-MMC term is promoted based on the undermentioned premise compiled by the old research worker. Degree centigrades: UsersUserDesktopimage-3.jpg 2.3 Activity in Steel Framing Construction Raising structural steelwork for constructing building takes topographic point in a dynamic, altering environment where there are many jeopardies and hazards. Proper and seasonably planning and coordination are the most effectual ways to pull off those jeopardies and hazards. Undertakings affecting structural steel building have four chief phases where hazards to wellness and safety demand to be considered: aÃâ ? design aÃâ ? fiction aÃâ ? conveyance aÃâ ? hard-on. Diagram 1 The functional relationship between each party is outlined in Diagram 1, on the old page. Each party is responsible for the affairs that are under its direction and control. Pull offing hazards originating from these affairs is more effectual when parties on a regular basis consult one another and reexamine how the following portion of the procedure will continue. For illustration, near co-operation between all parties is indispensable to guarantee that the process for the hard-on of steel work is safe. They should: What Brought Our Ancestors To America? EssayThe failure of a individual member will non impact the whole prostration of the construction. This is particularly of import where structural stableness was provided by wall poising systems and steel roof. In add-on, a good planning should be implement to the effects of unusual tonss on the edifice, such as vehicle impacts and gas detonations. The structural design applied scientist must supply sufficient inside informations to let the store detailer to fix shop drawings and the hard-on applied scientist to fix the hard-on design The store drawings and hard-on design should be submitted to the structural design applied scientist for reappraisal to guarantee that they comply with the demands of the structural design Before the store drawings are produced, the parties involved in the design, fiction, conveyance and hard-on procedure should intercede to be after the complete building and hard-on sequence. The tabular array show what hazards may originate if the design does non adequately supply for safety in the hard-on of the construction. Methods for pull offing and commanding the hazard of jeopardies are besides provided. Common jeopardies the build ability of the design Collapse of construction due to member failure from impermanent lading during hard-on Members non designed for transit Hazard Control The structural design applied scientist is required to supply design drawings which include: purlin and frame item levelling tablet item day of the month and issue figure of pulling programs and lifts clearly bespeaking the structural framing and layout the class of steel member support required for in-service tonss and impermanent conditions structural design standards impacting building do proviso for positive connexion between members of the construction that have been specified to defy imposed sidelong and perpendicular force Consideration should be given to inside informations such as: site restrictions bringing sequence local street entree conveyance demand overhead obstructors. 2.6.2 Pull offing hazard at the fiction phase Common jeopardies Fabrication mistake Incomplete fiction ( losing constituent ) Collapse of construction due to element failure Members non clearly marked or identifiable Weld failure due to hapless quality or deficiency of proving Incomplete or inaccurate store pulling Hazard controls The storyteller must: guarantee strength of members by utilizing classs of steel which are in conformity with the relevant criterions guarantee store drawings comply with the structural design drawings 2.6.3 Pull offing hazard at the transit phase Common jeopardies Vehicle hit Lack of set-up infinite Access or emersion: steep class and short pitch Worker falling from vehicle during lading and droping Steel falling from slung tonss while droping Steel falling because the vehicle burden is unstable or becomes unstable during droping Hazard controls Before lading vehicle The storyteller should look into that: The sequence of burden is agreed between the storyteller and the builder each member is clearly marked The transporter should look into that: trucks have keeping spikes in topographic point steel is supported and secured, so that there is no uncontrolled motion of steel until it is ready to raise. sufficient hardwood carriers, or equivalent, have been provided for burden. The Builder should look into that: the sequence of burden is agreed between the builder and the erector a Crane of the needed type and capacity is at the site the country for droping is house and degree and checked for burden capacity and where applicable or necessary, land calculations there is an equal set-up country there is a traffic direction program the class and pitch of access/egress is suited and safe for the vehicles and their tonss. When lading the vehicle The Transporter should look into that: the vehicle and burden is stable and burden will stay stable during droping. On vehicle s reaching at site The Transporter should look into that: procuring ironss or straps are non removed until keeping spikes in topographic point the steel has non shifted into a unsafe place the vehicle is positioned as directed by the erector and stabilised before the steel restraints are released if the unloading sequence can take to the instability of tonss, the steel is separately restrained and the burden constellation checked so that droping does non ensue in the burden or the vehicle going unstable the vehicle is non moved without the steel being decently secured. The Erector should look into that: tonss are lifted in a degree mode tonss are non lifted vertically or at a incline tonss are sufficiently secured to forestall inside lengths from falling out if the package is at an angle there is fall protection for workers and doggers on the truck. 2.6.4 Pull offing hazard at the hard-on phase Common jeopardies Falling from a tallness while set uping Falling objects Collapse of the construction during building Bing struck by works Plant reaching belowground or overhead public-service corporation services Bing struck by objects such as steel members Hazard Controls The erector should cut down the demand for work at height by: building every bit much of the steelwork as possible ( such as faculties or frames ) at land degree, or from erected floor slabs or decks in the construction, and where moderately operable, let go ofing the raising sling or device from land degree by the usage of long slings, distant release bonds or other suited devices. The erector should forestall the hazard of a autumn of a individual working at a tallness by utilizing in order of effectivity: inactive autumn bar devices, for illustration, work platforms work-positioning systems such as travel-restraint systems and industrial rope-access systems, and autumn arrest systems such as gimmick platforms and safety-harness systems. The erector should cut down the hazard from falling objects by: curtailing entree when there is overhead work by set uping, where operable, exclusion zones preventing, where operable, loads being lifted or transported over people or comfortss guaranting merely rigger slings loads and, where appropriate, repair ticket lines utilizing raising beams to place members where necessary to guarantee the stableness of the member sing margin screens, safety rails with built-in toe-boards and wire mesh, debris cyberspaces, cantilever work platforms, scaffolding sheathed with protective stuff and/or laniards to procure tools and equipment utilizing stuffs boxes which are to the full sheeted to envelop the burden guaranting safety helmets are worn at all times. a ) Before hard-on, to avoid prostration, the erector should: guarantee a consecutive hard-on process is prepared, which has been approved by the hard-on applied scientist and is consistent with the marker programs guarantee that an experient steel hard-on supervisor is present at all times to supervise the execution of the consecutive hard-on process guarantee an equal exclusion zone to forestall hazard to other people non involved in the hard-on merely get down the hard-on of a member or sub-assembly when equipment to guarantee the construction s stableness is available and being used guarantee impermanent cats or poising are firmly anchored topographic point equal ocular barriers between cats and plant/vehicle motion countries. B ) During hard-on, to avoid prostration, the hard-on supervisor must: verify the stableness of the construction in conformity with the hard-on applied scientist s specifications: at the terminal of each work twenty-four hours when fasteners may be uncomplete during strong air currents or when strong air currents are forecast seek blessing from the builder ( or hard-on applied scientist where appropriate ) to discontinue work at unscheduled points where the construction has non been completed to the specifications of the hard-on applied scientist s design Obtain, from the builder, the hard-on applied scientist s written blessing before tonss are placed onto the construction where possible, start hard-on in a nominative braced bay. If this is non possible, do certain that the hard-on applied scientist is involved in developing an alternate site-specific consecutive hard-on process. look into the adjustments for the support of columns during hard-on, to guarantee equal structural capacity for the hard-on conditions do certain that all beams are secured before let go ofing the slings do certain that all bolted connexions are effectual to guarantee the stableness of the steel construction. 4 To avoid being struck by works and before the usage of a Crane or any other powered nomadic equipment, the erector should see: Crane choice, protection of the populace the location of any diggings or belowground services that may impact a Crane burden the propinquity of overhead power lines the capacity of the land or back uping surface to bear the burden look into the type and sum of packing required under the Crane s outriggers to back up the proposed tonss written processs for puting up and dismantlement of the Crane and the lifting method the composing of the set uping crew suits the occupation processs for ocular and hearable signals between the Crane operator and the hard-on crew land support conditions choice of raising cogwheel exigency processs prevailing or calculate weather conditions the demand to avoid raising tonss over people. The usage, of two or more Cranes to travel and place tonss, is risky and should be avoided if a individual Crane is capable of making the occupation. Where it is necessary to utilize two Cranes to double lift members, the undermentioned controls are to be implemented: the weight of the burden and its Centre of gravitation every bit good as the weight of the lifting cogwheel must be carefully calculated. Cranes of similar features should be selected. the place of each Crane should understate motion and slewing. the lifting capacity of each Crane must be 20 % greater than the portion of the burden. 5. Where works is working near overhead lines, the erector should: place all power lines services before allowing any Crane or other nomadic works on site cheque that stuff and works is moved or operated outside the No Go Zone of 3000 millimeter from an overhead electrical overseas telegram on a pole or 8000 millimeter if the electricity overseas telegram is on a tower line ( If raising staging, the No Go Zone during this procedure is 4.6m distant and 5m below from the nearest power line ) if work or works is able to infringe on this clearance, the erector must obtain permission from the electricity company. 2.6.5 Other jeopardies jeopardies must be controlled. They may include: noise manual handling hot work exposure to risky substances unsafe goods electrical work Sun ( UV ) exposure.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.